Project Drivers:
- Deep energy retrofit overall target to reduce energy consumption by 60%
- Greenhouse gas emissions reduction target of 20,000 metric tons annually
- No capital investment by GSA with verified savings
- Project under an Energy Savings Performance Contract with an ESCO Partnership
Project Summary:
Transformer Retrofit & Energy Savings Verification
- Baseline of exsisting transformer energy losses
- 142 Powersmiths E-Saver-C3L low-voltage dry-type transformers replaced 142 inefficient existing transformers
- Post-install energy savings verified by Powersmiths professional metering services in an ISO17025 Certified Lab
Energy Savings Overview:
- Overall Annual Energy Savings: 627,214 kWh
- Peak Energy Demand Savings: 68.2 kW
- Annual GHG Emissions Reduction: 462.9 tons CO2